With the first successful opening of the new Nike store in Senayan City also managed by Enviro Tec, the second store at Mall Kelapa Gading (MKG) was another successful one with completion on right timeline despite the short schedule.
The existing store that already existed in MKG was removed and replaced with a bigger area taking up 2 tenant lots, located on the same level. For this particular new store, there would be a designated area for Basketball zone.
For Design Drawing Intent Package, the brief requested to implement design brief given by NIKE & conceptualize & present an overall set of interior layout drawings, showcasing design intent originally by Nike Worldwide.
The brief also asked to provide a full set of design drawings that include drawings for a range of joinery units which based on NIKE standard joinery design.
Completed within a construction period of 2 months, the team worked well together with constant communication and site review. Result was ace.